KAJANG, 11 January 2016 – Maju Expressway (MEX) would like to inform that the Seri Kembangan Toll Plaza of MEX Highway which was opened to the public on December 13, 2015 will commence it’s collection beginning 00:01 am, January 13, 2016 .
The toll collection system at the toll plaza will be an opened toll system. The rates are as follow:
Description | Unit | Quantity |
---|---|---|
Carriageway | meter | 18,000 |
Traffic Control & Surveillance Systems | ||
Emergency Telephone | Every 2km (both sides) |
|
Close Circuit TV (CCTV) | Where Necessary |
|
Variable Message System (VMS) | Min 2 units |
|
Bridges | No. | 26 |
Vehicular Box Culvert | No. | 2 |
Mainline Toll Plaza | No. | 1 |
Supervision Building | No. | 1 |
Full Electronic Toll Collection (ETC) shall be implemented at the Seri Kembangan Toll Plaza and motorists are expected to utilise either Touch ‘ n Go Card, PLUSMiles Card or SmartTAG to pay toll.
Motorists are advised to follow the road and directional signages installed at the toll plaza for smooth journey.
For more information about the toll rates and the latest info about traffic on MEX Highway, the public can call MEX Helpline at 03-8315 9111 or follow MEX official twitter @MEXTraffic and Facebook MEX Traffic or Rakan MEX .
For more information on the statement, kindly contact:-
Saiful Bakhri Mohd Annuar
Corporate Communication & Commercial Department
Maju Expressway Sdn Bhd
Tel: 03 8315 9121
HP: 019 2547217
Emel: saiful@mex.com.my